This weekend saw us lay the final piece of the concrete jigsaw on the barn floor, well at least for now.
Melv prepared the middle section of the floor ready, scrapping back any high bits and wetting down to keep the dust under control.
By 8am, the 1 tonne dumper was standing at the ready while the concrete lorry did its mixing.
No comments:
Post a Comment